Deskripsi pekerjaan
Perusahaan sedang mencari Commissioning Engineer (Electrical) untuk mendukung aktivitas commissioning pada proyek Data Centre di Cikarang, Jawa Barat. Peran ini bertanggung jawab untuk merencanakan, mengoordinasikan, dan melaksanakan aktivitas commissioning sistem kelistrikan, serta memastikan kepatuhan terhadap standar keselamatan dan spesifikasi proyek.
Tanggung jawab: Plan, coordinate, and execute electrical commissioning activities for data centre systems; Review electrical drawings, specifications, method statements, and commissioning procedures; Conduct testing and commissioning of LV/MV electrical systems; Perform functional and performance testing of electrical equipment and systems; Coordinate with contractors, consultants, vendors, and other project teams; Identify, troubleshoot, and resolve electrical issues; Prepare and review commissioning test scripts, checklists, and reports; Ensure all commissioning activities comply with project specifications and safety requirements; Monitor and document testing results, defects, and rectification works; Support integrated systems testing (IST) and ensure systems are ready for handover.
Kualifikasi: Bachelor’s/Diploma degree in Electrical Engineering or a related field; Minimum 2 years of experience in electrical testing & commissioning; Experience in Data Centre projects is highly preferred; Strong knowledge of electrical systems, including UPS, generators, transformers, switchgear, ATS/STS, and distribution systems; Experience with testing and commissioning procedures, documentation, and troubleshooting; Familiar with electrical safety standards and commissioning practices; Strong coordination and communication skills; Able to work independently and as part of a project.
Tanggung jawab
- Plan, coordinate, and execute electrical commissioning activities for data centre systems
- Review electrical drawings, specifications, method statements, and commissioning procedures
- Conduct testing and commissioning of LV/MV electrical systems
- Perform functional and performance testing of electrical equipment and systems
- Coordinate with contractors, consultants, vendors, and other project teams
- Identify, troubleshoot, and resolve electrical issues
- Prepare and review commissioning test scripts, checklists, and reports
- Ensure all commissioning activities comply with project specifications and safety requirements
- Monitor and document testing results, defects, and rectification works
- Support integrated systems testing (IST) and ensure systems are ready for handover
Kualifikasi
- Bachelor’s/Diploma degree in Electrical Engineering or a related field
- Minimum 2 years of experience in electrical testing & commissioning
- Experience in Data Centre projects is highly preferred
- Strong knowledge of electrical systems, including UPS, generators, transformers, switchgear, ATS/STS, and distribution systems
- Experience with testing and commissioning procedures, documentation, and troubleshooting
- Familiar with electrical safety standards and commissioning practices
- Strong coordination and communication skills
- Able to work independently and as part of a project
Informasi lowongan
- Tipe pekerjaan
- Contract
- Pendidikan
- D3
- Gaji
- Rp 7.500.000 – Rp 9.000.000 per month
- Batas lamaran
- 17 Oktober 2026